Week 3 of the ORC: It's All in the Details


Each week arrives too quickly, because it feels like we haven't made any major progress! I'm sure it will all come together, but between work, a toddler, life events, doctor appointments, and more, our bathroom has been on the back end. 


This week was a lot of prep and detail work—we have all the pieces in place, we just need to start putting together the puzzle.


What We've Done So Far:

  • Ripped everything out during DEMO Week
  • Bought Vanity and Bathtub
  • Picked Up Flooring and Grout
  • Closed up the medicine cabinet hole
  • Moved the bathtub drain so the new tub can fit 
  • Ordered Mirrors 

                


What We Need To Do:

  • Install Bathtub
  • Frame out Shower
  • Lay Flooring
  • Bring In New Vanity
  • Repair/Repaint Walls
  • Tile Bath/Shower
  • Window Treatment 
  • New Toilet
  • New Lighting 
  • Accessorize


Sneak peek of new mirrors for the bathroom! 


The list is growing but we have 5 weeks left! Can we make it? It's a good thing you don't really get penalized for not finishing, but I have hope that we can do it! It will take a few long weekends and nights, but I'm going to try to help Jonathan as much as possible, because he actually knows what he's doing. 


Check out the One Room Challenge blog to see everyone's progress! 


Comments

Popular Posts